Get Inspired by our Sound construction and craftsmanship.
Below are just a small handful of our latest projects. After 50+ years, the Soundtex Interior Contractors team have worked on 100’s more. We can’t show all of them but if you contact us, we can have a sit-down and discover together what is possible in your spaces.
Just a few of our favourites over 5 decades…
Location: Westmount Corporate Campus, Building 3 4838 Richard Road SW, Calgary, AB
Area: 120,000 sq ft
Description: Complete build out of 4 floors – using Technion demountable partitions.
Location: Floors 20 and 21, Centennial Place 250 – 5 Street SW, Calgary, AB
Area: 20,800 sq ft
Description: Two complete floors build out with open area concept. Small amount of demountables, a Conference Centre with full working kitchen.
Location: 6 Floors at 520 – 3 Avenue SW, Calgary, AB
Area: 107,520 sq ft
Description: Complete build out including combination drywall and demountable partitions, a large Tech Centre and Meeting Rooms on every floor.
Location: 5 Floors at 525 – 8 Avenue SW, Calgary, AB
Area: 77,500 sq ft
Description: Complete build out of 5 floors of new offices, with a high level of finishes in a Lounge, Lobby and major Conference Room
Location: 9th Floor, 525 – 8 Avenue SW, Calgary, AB
Area: 21,000 sq ft
Description: New offices for this brokerage firm with a high degree of finishes incorporated within the design. There were a number of Video Conference Rooms included.
Location: 23rd Floor Centennial Place 520 – 3 Avenue SW, Calgary, AB
Area: 10,980 sq ft
Description: New offices for a Calgary based oil and gas company. The Reception area featured a complete wall of LED lights behind onyx panels.
Location: 1602 Airport Road NE, Calgary, AB
Area: 75,000 sq ft
Description: Four floors of offices in the Airport Commercial Tower. AV and security systems were a priority on this project.
Location: 32nd Floor Eighth Avenue Place 525 – 8 Avenue SW, Calgary, AB
Area: 21,000 sq ft
Description: Brokerage firm with a large amount of offices , boardrooms and sliding glass dividers within the Conference Centre
Location: Floors 4,5 and 6 Centennial Place 250 – 5 Street SW, Calgary, AB
Area: 120,000 sq ft
Description: This was a very sophisticated project – complete with new offices with and a Video Conference Centre. It contained a very high degree of finishes as well, with floating wood ceilings in the Lobby and Reception.
Location: Floors 3,4,5,6,7,8, 9 and 11 605 – 5 Avenue SW, Calgary, AB
Area: 130,000 sq ft
Description: (8) Floors of complete restacking. New construction was demountable partitions – half of one floor was a Conference Centre with moveable partitions. Each floor was completed one at a time.
Location: 3200, 605 – 5 Avenue SW, Calgary, AB
Area: 17,000 sq ft
Description: (4) floors – Upgrade Reception, all Lobbies, coffee stations, new paint and carpet and a Conference Centre, as well as a 4800 sq ft Fitness Centre .
Location: 2 Floors Fifth Avenue Place 425 – 1 Street SW, Calgary, AB
Area: 45,300 sq ft
Description: Carpet, paint and renovations to approximately 30% of the offices.
Location: Harry Hays Building 440 – 4 Avenue SE, Calgary, AB
Area: 30,000 sq ft
Description: Complete renovation of offices and auditorium, complete with seating, custom graphic wall vinyl, wood suspension ceiling with compound angles.
Location: Floors 22 – 24 BVS 4 250 – 6 Avenue SW, Calgary, AB
Area: 24,600 sq ft
Description: This project included demolition of existing floors prior to building new offices to met the clients requirements and design criteria.
Location: Main Floor Eighth Avenue Place, 525 – 8 Avenue SW, Calgary, AB
Area: 7600 sq ft
Description: Conference and Display Centre with state-of-the-art fixtures, lighting and HVAC. open ceiling concept.
Location: 16th and 17th Floors Scotia Tower
Area: 20,600 sq ft
Description: Complete renovations to the 16th and 17th Floors, including a new internal stair between the floors.
Location: Le Germain Office Complex 200, 110 – 9 Avenue SW, Calgary, AB
Area: 3,140 sq ft
Description: Full office renovation for the relocation of Bloomberg News/Sales Bureau, including a Conference Centre and open concept, feature walls of metal, MDF and fabric.
Our professional team is here to construct your space the way you want it.
Contact us today and get a free estimate.
Soundtex Calgary Interior Contractors has been at the heart of Commercial Construction in Calgary for 50 years.
In the spirit of reconciliation, we acknowledge that we live, work and play on the traditional territories of the Blackfoot Confederacy (Siksika, Kainai, Piikani), the Tsuut’ina, the Îyâxe Nakoda Nations, the Métis Nation (Region 3), and all people who make their homes in the Treaty 7 region of Southern Alberta.